RU EN
We are on social networks:

Yarudeyskoye field

Description

Most of the recoverable reserves at the Yarudeyskoye field are in located in crude oil deposits. NOVATEK launched commercial production at the Yarudeyskoye oil field on 1 December, 2015. Planned production level is equivalent to approximately 3.5 million tons of crude oil on an annualized basis.

Data
Year of finding field
2008
Launch date
2015
License holder
Yargeo (NOVATEK's share - 51%)
License type
Exploration and Production
Date of expiration
Till 2029
Natural gas proved reserves (SEC)
9.6 bcm
Liquids proved reserves (SEC)
17.2 mmt
Share in NOVATEK production in 2017
2% of natural gas production and 31% of liquids production

Infrastructure

Thirty-six (36) production wells have been drilled and the field’s infrastructure includes a central oil treatment facility, oil and gas gathering systems, a pumping station, and crude oil and gas pipelines linking the field to the trunk pipeline systems.

In 2017 the gas treatment unit was upgraded, and a 3S (supersonic) separation unit was commissioned. This allowed to increase the capacity of the gas treatment unit with minimum capital costs, significantly improve the quality of gas drying and increase the yield of liquid hydrocarbons.