Yarudeyskoye field
Description
Most of the recoverable reserves at the Yarudeyskoye field are in located in crude oil deposits. NOVATEK launched commercial production at the Yarudeyskoye oil field on 1 December, 2015. Planned production level is equivalent to approximately 3.5 million tons of crude oil on an annualized basis.
Infrastructure
Thirty-six (36) production wells have been drilled and the field’s infrastructure includes a central oil treatment facility, oil and gas gathering systems, a pumping station, and crude oil and gas pipelines linking the field to the trunk pipeline systems.
In 2017 the gas treatment unit was upgraded, and a 3S (supersonic) separation unit was commissioned. This allowed to increase the capacity of the gas treatment unit with minimum capital costs, significantly improve the quality of gas drying and increase the yield of liquid hydrocarbons.