Yarudeyskoye field

Field map

 

Description

Most of the recoverable reserves at the field are in located in crude oil deposits.

Data

Year of finding field2008
Launch date2015
License holder
Yargeo (NOVATEK's share - 51%)
License typeExploration and Production
Date of expirationTill 2029
Natural gas proved reserves (SEC)9.6 bcm
Liquids proved reserves (SEC)17.2 mmt
Share in NOVATEK production in 20172% of natural gas production and 31% of liquids production

 

Infrastructure

Thirty-six (36) production wells have been drilled and the field’s infrastructure includes a central oil treatment facility, oil and gas gathering systems, a pumping station, and crude oil and gas pipelines linking the field to the trunk pipeline systems.

In 2017 the gas treatment unit was upgraded, and a 3S (supersonic) separation unit was commissioned. This allowed to increase the capacity of the gas treatment unit with minimum capital costs, significantly improve the quality of gas drying and increase the yield of liquid hydrocarbons.